|
Wilkie Pilot Test Work in Progress Work in progress on the Wilkie Pilot Test Program on Sept 08, 2009 69 KB, approx. 14 seconds at 56.6Kbps |
|
Wilkie Wellsite preparation commences 210 KB, approx. 40 seconds at 56.6Kbps |
|
3 phase power is installed for the Deloro/EPI pilot plant at the Wilkie Project site 82 KB, approx. 16 seconds at 56.6Kbps |
|
Wilkie Wellsite preparation commences 80 KB, approx. 16 seconds at 56.6Kbps |
|
Wilkie Wellsite preparation commences 71 KB, approx. 14 seconds at 56.6Kbps |
|
3 phase power is installed for the Deloro/EPI pilot plant at the Wilkie Project site 89 KB, approx. 18 seconds at 56.6Kbps |
|
Representatives of Deloro, EPI, and Saskpower met to determine the best route for 3 phase power to the Wilkie Project site. 483 KB, approx. 1 minute, 31 seconds at 56.6Kbps |
|
The Wilkie Project Power Supply onsite 417 KB, approx. 1 minute, 19 seconds at 56.6Kbps |
|
Saskpower is greeted on the Wilkie Project by Ken Wittle of EPI 469 KB, approx. 1 minute, 28 seconds at 56.6Kbps |
|
Wilkie Project Horizontal Wellhead 569 KB, approx. 1 minute, 47 seconds at 56.6Kbps |
|
Nearby Oil Wells 28 KB, approx. 6 seconds at 56.6Kbps |
|